
Approval & Design of Safety Plans
We prepare and design safety system drawings per highest engineering standards and Saudi Civil Defense requirements, including hydraulic calculations, alarm, suppression, and evacuation drawings submitted via the Salama portal for approval.
Features
Included Systems
Frequently Asked Questions
+How long does drawing approval take?
Usually 2-4 weeks depending on document completeness and compliance.
+Must drawings be modified if rejected?
Yes, we handle all required modifications until final approval.
+Can you review drawings by another company?
Yes, we provide review and correction services for existing drawings.
Other Sub-services
Issuing Approved Safety Certificate
Obtaining Civil Defense approved safety certificates for all types of facilities quickly and professionally
Issuing Approved Engineering Work Handover Certificate
Issuing certified engineering work handover certificates from an approved office to complete licensing requirements
Issuing Approved Immediate Technical Report
Preparing and issuing approved urgent technical reports for safety systems in the fastest time
Issuing Approved Non-Immediate Technical Report
Comprehensive and in-depth technical reports prepared carefully for complete facility safety documentation
Issuing Approved Suitability Report
Approved compliance reports proving your facility meets Civil Defense and Saudi Code requirements
Issuing CCTV Compliance Certificate
Approved certificates proving the CCTV surveillance system meets Civil Defense and regulatory requirements
Qualifying Facilities for Civil Defense Licensing
Comprehensive service to prepare your facility per all Civil Defense requirements in preparation for licensing
Need this service?
Our engineering team is ready to provide the best solutions for your project.
Request Service Now+966 51 085 6006Back to
Civil Defense Services
All Services

